Lagos Red Line Rail
The Lagos Red Line is a commuter rail system running from Agbado in the northwest to Marina on Lagos Island. It follows the existing Nigerian Railway Corporation (NRC) track corridor and will serve some of the most densely populated communities in Lagos, including Agege, Mushin, Yaba and Lagos Island.
37 km
Line Length
11
Stations
~50 minutes end to end
Journey Time
Commuter Rail
Type
2025–2026
Expected Opening
Under Construction
Status
Under Construction — Expected 2025–2026
The Lagos Red Line is currently under construction. The schedule and fares shown are projected figures based on LAMATA's published plans. Trial runs are expected to begin in late 2025, with full commercial operations in 2026. Follow lamata-ng.com for official updates.
Service Notices
The Red Line is currently under construction. Trial runs are expected to begin in late 2025, with full commercial operations projected for 2026. Follow LAMATA official channels for updates.
🚉 Planned Stations (11)
11 stops🗺️ Route Overview
The Red Line follows the existing Nigerian Railway Corporation (NRC) corridor from Agbado in the northwest, passing through some of Lagos's most densely populated communities — Agege, Mushin and Oshodi — before crossing to Lagos Island via Yaba, Ebute Metta and Iddo.
🕐 Projected Schedule
🎟️ Fares
📋 Travel Rules
- ✓No food or drinks on trains
- ✓No smoking in stations or on trains
- ✓Priority seating for elderly, pregnant and disabled passengers
- ✓Children under 5 travel free with a paying adult
- ✓Valid token or card required before boarding
- ✓Platform doors must be clear before train departure